Following flooding in Chanthaburi Province that damaged homes and electrical systems, Burapha University—through the Faculty of Business Administration and the Chanthaburi Campus—along with the Faculty of Engineering and other partners, carried out field recovery efforts. The Faculty of Engineering inspected electrical and structural safety and developed the BUU Flood application to screen and coordinate assistance to match each household’s needs.
Project Coordinator: Dr. Nattapan Thanomsat and Asst. Prof. Dr. Nayot Kurukitkoson
Objectives:
1) To assist and restore people’s homes after flooding.
2) To inspect the safety of electrical systems and building structures, assess risks and refer cases to specialists.
3) To develop and use the BUU Flood application to screen data, record coordinates and coordinate referrals efficiently.
4) To integrate cooperation among the university, students, volunteers and related agencies. 5) To enable people to return to safe and sustainable living.
Program Activities:
On 10 October 2026, Burapha University deployed to Khomong Sub-district, Tha Mai District, Chanthaburi Province, with the Faculty of Business Administration and the Chanthaburi Campus as the main organisers and the Faculty of Engineering supporting electrical and structural safety inspections. Dr Nattapan Thanomsat, Head of the Department of Electrical Engineering, coordinated the engineering work and organised expert teams to inspect insulation, leakage of current to ground, electrical panels, breakers, and residual-current devices; assess water-damaged appliances and preliminary building conditions; and use the BUU Flood application developed by Asst. Prof. Dr Nayot Kurukitkoson to screen data, record GPS coordinates and forward tasks via LINE. On the first day, over 120 volunteers visited 186 households and referred 249 tasks.
Expected Outcomes (Impacts):
1) Over 120 volunteers visited 186 households within approximately 3 hours.
2) Needs were classified as red for 10 households, yellow for 87 households and green for 89 households.
3) A total of 249 tasks were referred to specialists, including 28 electrical inspection tasks and 37 structural tasks.
4) Two houses at risk of collapse, 35 houses with cracks and 15 houses with water-affected electrical panels or wiring were found.
5) 166 appliances and items requiring repair were identified.
6) The BUU Flood application was updated 7 times in a single day based on feedback from actual operations.
Date of Implementation: 10 October 2026